Quality Control

The Quality control functionality enables functions that are needed for quality control, it is possible to turn the quality control on for any stock item (both procured and produced) and perform inspections of arrived goods which are automatically put on hold for inspection.

This functionality can be enabled at Settings -> System settings -> Professional functions -> Quality control.

If enabled, the following functions will become available:

  • The Procurement -> Inspection tab becomes available.
  • Two additional statuses are available for stock lots: "On hold" and "Rejected".
  • It's possible to enable "Quality Control" for each item in the item details.
  • It's possible to set a default "On-hold period" in days for each item in the item details. 
    If the item is procured, The expected availability date = Expected arrival date of PO + On hold period.
    If the item is manufactured, The expected availability date = Expected finish date of MO + On hold period.
  • If procured items are subject to quality control, the quantity and the percentage of rejected items are shown for each vendor on Procurement -> Vendors page.
  • It's possible to create Service orders for rejected items in Stock -> Stock lots -> Rejected stock lot details (What is a Service Order?), or write the rejected items off.

Jump to:

  1. Demo video: Quality Control
  2. How does quality control functionality work?
  3. Setting up quality control for an item.
  4. Performing quality inspection of incoming goods.
  5. Repairing, writing off rejected items.
  6. User rights for performing inspections.

How the quality control functionality works

If a stock item is subject to quality control:

  1. When a PO is received, or a MO finished, the stock lot of the items is assigned the status "On hold".
  2. The list of on-hold items is displayed in Procurement -> Inspection.
  3. The quality control manager should approve or reject these, either fully or partially. 
  4. Approved items get received into stock.
  5. Rejected items
    - get the status "Rejected",
    - are assigned a new unique stock lot number (with a reference to the original).
    - All bookings for the rejected items are canceled.
  6. Rejected items can be
    - repaired with a Service order which can be created at Stock -> Stock lots -> Rejected stock lot details.
    - manually written off at Stock -> Write-offs.

Setting up quality control for an item

For setting up quality control for an item:

  1. Open the item's details at Stock -> Items.
  2. Check the checkbox Quality control: Yes.
  3. Enter the average On hold period in days. 
    The Availability date = Expected date of PO or expected finish date of MO + On hold period.
  4. Save.

Performing quality control

  1. The items must be received in stock (the stock lot status is "On hold").
  2. Open the inspection details of the stock lot at Procurement -> Inspection.
  3. Enter the approved quantity.
    - To reject the whole lot, enter approved quantity 0.
  4. Click "Approve/Reject".

Repairing rejected items

To repair rejected items, please go to Stock -> Stock lots, find the rejected lot, open it, and click the button "Create a service order". A service order can be for repairing the whole rejected lot or for only part of the item.

When a service order is created:

  • It is possible to book additional materials and assign operations.
  • The rejected items are booked as parts.
  • A new target stock lot for repaired items will be created. This guarantees full traceability and correct cost control.
  • With the Subcontracting functionality enabled, it is possible to assign operations to vendors, and you can issue a PO to track the progress of repair/replacement.

User rights for performing quality inspection

To perform quality control in Procurement -> Inspection the user needs to have appropriate rights set in Settings -> Human Resources -> Users -> User details.

We use cookies to enhance your experience on our website. If you continue using this website, we assume that you agree with these. Agree Learn more Ok