Revision/Version Control System

The Revision/Version Control System in MRPeasy allows tracking changes to Bills of Materials (BOMs) and Routings.

  • How to keep track of the history of changes made to a BOM or a Routing, who made these, when.
  • How to restore previous versions of BOMs and Routings.

User Manual: Revision/Version Control System (VCS)

See more videos

Transcript:

With MRPeasy Enterprise edition, it is possible to track changes to your bills of materials and routings.

If a change has been made to a BOM or routing, MRPeasy automatically creates a new version and archives the previous version.

In the Versions section of BOM or routing, you can see the whole history of changes – when a specific version was saved, who created it, download its PDF, and, if necessary, set a previous version as the current active version.

Enabling the revision control system

The revision control system can be enabled at section “Settings – System settings – Enterprise functions.”

In this video, we described how to track changes to your bills of materials and routings.

To learn more about MRPeasy, please see our other videos.

Thanks for watching!

Keywords: Version control system, VCS, revision control, BOM versions, BOM management, Bill of materials, routing versions