Backward Scheduling:
Backward scheduling, also referred to as reverse scheduling, is a production planning method in which production is scheduled to be completed as close as possible to the promised delivery date. It is one of the central aspects of Just-In-Time manufacturing.
Read more about Backward Scheduling.